The works were carried out on the "Nyurbinskaya Tube", which is a part of the Nakynsky kimberlite field. The behavior of mineralized brines pumped to the reservoir from the main quarry has been studied, using of electrical prospecting VP-SG and ZSB. The results of the works are allowed to recommend a technique for long-term monitoring of the reservoir condition.